Flow simulation before the first wall.
Route personnel, material and waste flows through the rooms you choose, measure the time and space they take in each room, and detect crossings, tight doors and bottlenecks while the layout can still change.
- Personnel
- Materials
- Waste
- Crossings

Built for pharma, step by step.
- 01
Personnel and material paths
Each flow follows the shortest walkable path through its sequence of rooms, around equipment and pillars, and across floors. Personnel never use pass-throughs.
- 02
Contamination analysis
Crossings are flagged with their severity: personnel against material, and waste against any other flow, are critical.
- 03
Package sizes
Each package is checked against every door on its path, and two flows crossing in a room must be able to pass side by side.
- 04
Room usage and bottlenecks
Time spent and floor space taken in each room, airlocks kept busy too long, with the expected wait to enter them.
How the flows are simulated
Geometry and plain arithmetic on your plan: nothing is estimated that you can't check.
- 01
Routing and trip time
The building becomes a graph of rooms, doors and floor accesses, linked by walking distances. Dijkstra's algorithm finds the shortest path between consecutive rooms of each flow.
- 02
Room usage
Each segment of a path counts in the room it crosses, as does the time spent in the room, multiplied by the trips per hour.
- 03
Doors and crossings
A package passes a door on its narrowest side. Where two flows cross, the room must be wide enough for both packages side by side.
- 04
Bottlenecks
Interlocked airlocks let one passage through at a time: they are judged on their busy time, with the M/M/1 queue wait. Other rooms are judged on the floor space taken.
Goes hand in hand with
Flows checked
Clean and dirty crossings, packages too large for a door and saturated rooms.
Multi-floor buildings
Design over several floors, connected by staircases, elevators and shafts.
Real-time collaboration
The whole team works on the same project at the same time, and every change shows up instantly.
Frequently Asked Questions
What kind of flows can be simulated?
Personnel, materials and waste, each with its sequence of rooms, its frequency per hour or per day, its package size and the time spent in each room.
How are crossing conflicts detected?
Paths are compared two by two on the plan. Personnel crossing material, or waste crossing any flow, is critical; other crossings are flagged for review, and too narrow a crossing is a congestion.
Does it work on multi-floor buildings?
Yes. Flows follow staircases, elevators and shafts between floors.